Abstract
Many governments in the world are now under heavy pressure for improving services of health care whilst always attempt to use their scarce resources efficiently. Hospital buildings are basically one of the important elements of health care systems. This paper aims to determine factors causing cost overrun in Vietnamese hospital projects. Survey questionnaire and Exploratory Factor Analysis (EFA) are two main methods. The finding indicates that main groups causing cost overrun in hospital projects are: additional work, material cost, and delays. Based on groups of cost overrun, twenty factors were also discovered as well as ranked. In addition, solutions were suggested to solve the cost overrun issue, and then comparisons with previous studies were presented. Results of the study could be applied to monitor policies for the management of hospital projects, and support practitioners in attaining the success of hospital projects.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.