Abstract

Equipment for selective laser melting (SLM) has mainly been developed for applications in rapid prototyping. This paper provides a methodology for a cost-oriented optimisation and planning of SLM equipment for series production lines. The approach thus supports the transition to more productive and cost-efficient equipment.The paper presents a two-step methodology: at first, setup time is reduced using heuristic rules based on the activity node network plan. Afterwards, the build-up time is optimised by cost and performance parameters like laser power and build chamber size. Using the presented methodology rules for a cost-oriented SLM-equipment can be derived.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call