Abstract

The viability of any manufacturing plant is a function of time and cost. Automobile manufacturing is the most competitive sector. The objective of this paper is to provide a detailed description of the development of the relationships between cost of failure and time lost due to equipment failure, cost of inventory and time lost due to shortages of material, cost of set up and time lost due to set up, cost of absenteeism and time lost due to absenteeism, and cost of material handling and time lost due to material handling. Relationships are established scientifically using regression modelling, simulation and discussions with domain experts. Results are validated in an operational vehicle assembly line. The results demonstrate that the established models follows a cubic relationship as against the hyperbolic relationship previously reported in literature. Further, an improved model strong 17 strong constraints is presented which may be useful for managers in taking cost-based decisions to improve the throughput.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.