Abstract

Chemical engineering analyses are underway for a commercial-scale [1000-MW(electric)] divinyl benzene foam-based Inertial Fusion Energy (IFE) Target Fabrication Facility (TFF). This facility is designed to supply 500 000, 4-mm-outer diameter targets per day—coated via interfacial polycondensation, dried with supercritical CO2, sputter coated with Au and/or Pd, and filled with deuterium-tritium layered at cryogenic temperatures and injected into the fusion chamber. Such targets would be used in a direct-drive IFE power plant.The work uses manufacturing processes being developed in the laboratory, chemical engineering scaleup principles, and established cost-estimating methods. The plant conceptual design includes a process flow diagram, mass and energy balances, equipment sizing and sketches, storage tanks, and facility views.The cost estimate includes both capital and operating costs. Initial results for a TFF dedicated to one 1000-MW(electric) plant indicate that the costs per target are well within the commercially viable range. Larger TFF plants [3000 MW(electric)] are projected to lead to significantly reduced costs per injected target. Additional cost reductions are possible by producing dried, sputter-coated empty shells at a central facility that services multiple power plants.The results indicate that the installed capital cost is about $100 million and the annual operating costs will be about $20 million, for a cost per target of about $0.17 each. These design and cost projections assume that a significant process development and scaleup program is successfully completed for all of the basic unit operations included in the facility.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call