Abstract

Highway engineering requires higher investment and requires a long time of management compared to other construction projects. There are many factors that affect the project cost during the engineering construction stage of a highway. The effective development of cost management in the construction phase of highway engineering under the list pricing model can avoid unnecessary waste and help control the cost of highway engineering. However, there are still some problems in the development of cost management in the construction phase of highway engineering, which will affect the role of the list-based pricing mode in cost management. This paper explores and analyzes the advantages of the list pricing model and the problems existing in the cost management of the highway engineering construction stage under the list pricing model, and proposes effective management strategies to improve cost management of the highway engineering construction stage.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call