Abstract

A fuzzy neural network (FNN) model embedded with a modified particle swarm optimizer (MPSO) is proposed in this study for cost estimation of construction projects. The proposed method has advantages over traditional FNN approaches in ways of generalization ability and automatic parameter optimization. Comparative studies show that this improved model is also superior to those of BP (back propagation) neural network, PSO-BP and PSO-FNN. Effectively improved accuracy of the developed model in cost estimation of construction project was discussed in case studies. This study provides a base for decision-making in the management of construction project.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.