Abstract

Detailed and precise drafts of competition are key to successful BIM implementation in Czech localization, as they are used for creating BIM model and they are further worked with. This can only be ensured by specifications in contract – as far as information model and Cost management (CM) are concerned, the specifications required are data appointment and Execution plan of building information modeling which both should be included in contract. The data defined in these documents carry great potential for further use within building information modeling, realization and operation, and they have not yet been used to full extent of their potential. This paper explores what should be included in the above suggested key documents from CM point of view and also what is the current level of construction documentation in transportation engineering in the Czech Republic.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.