Abstract

Contingency costs are an important part of construction to achieve successful project management. In determining contingency costs, practitioners have used a very subjective approach. This study discussed the determination of the contingency cost of high-rise buildings in six research object projects, based on the results of risk evaluation. The risk evaluation used in this paper is based on the risks in the construction phase. The method used to know the relationship between risk and contingency costs is simple linear regression with tools. The results of this study indicate that the greater the level of risk, the greater the contingency costs incurred by the project. the risk level contributed 71.6% to the contingency cost, while the rest was influenced by other factors. The equation formed is, that if the risk increases by 1 unit, the total contingency cost will increase by 0.0916 units.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.