Abstract

Based on the concept of DSM and the requirements of the demonstration project, the DSM model of green lighting was studied, carrying out the cost-benefit analysis. Combining the characteristics of the demonstration area, first of all, the cost-benefit of different interest subjects was analyzed. Secondly, the association rules algorithm was analyzed in detail, and the cost-benefit was analyzed by the association rules algorithm. Finally, the sensitivity analysis of the key factors, affecting the cost and benefit of each interest subject, was done by using the algorithm. And it is concluded that the user subsidy rate and consumer electricity price are the key factors that affect the userТs willingness to use green lighting technology and power grid enterprises to implement DSM measures.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.