Abstract

The economic instrument is an effective approach to encourage demolition contractors to conduct low-impact waste management. It is essential for project managers and decision-makers to better understand the cost-benefit of demolition waste (DW) management, to promote development of an effective waste management plan. This study explores the interactive dynamics and adaptive nature between stakeholders, where the cost-benefit of DW management is analysed through the agent-based modelling approach. Shenzhen, a leading city in China in the management of DW, was selected as the study area. It was revealed that if the traditional demolition method is adopted as the primary choice, the net benefit of demolition of buildings in the study case will reach -131.4 billion yuan, i.e. the cost will surpass the revenue. If the selective demolition method is widely used by demolition contractors, simulation results indicate that the net benefit will reach 33.3 billion yuan, an increase of 125.34%, compared to the situation in which the traditional demolition method is widely implemented. Based on the simulation, an optimal management framework for DW management stakeholders was constructed. The research results can provide a decision-making basis for the government and relevant departments to formulate DW management measures.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.