Abstract

Five, single unit, 20,000-kw hydroelectric power plants, built with turbine settings as specified by the manufacturer have runner cavitation or pitting repair problems in a short time when operated as peak load plants. The methods, procedures, materials, timing, and cost of in-place welding repairs are described and given for the initial maintenance up-keep of all plants. Cost records and an analysis of peak capacity operation show that the value of extra power far exceeds the increased cost of runner maintenance.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.