Abstract
This paper deals with the cost analysis of a system having three modes (normal, partial failure and total failure) in two weather conditions—normal and stormy. Failure rates of the system and rates of change of weather conditions are constant while the repair rates are general. The repair time distribution depends upon the starting state of the repair and it does not alter with the change in weather. The system is observed at suitable regenerative epochs in order to obtain reliability characteristics of interest to system designers and operations managers. Earlier results are verified as particular cases.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.