Abstract

A mid country oil refinery requested for the analysis of spent caustic 4 in. damaged line pipe leading to spent caustic storage tank which failed after installation by localize corrosion attack within 8 months. The refinery also reported that the failures were frequent and were occurring at same region between continuous flow line (CFL) and intermittent flow line (IFL) at 6 O’ Clock position. The line duty cycle was half filled used as and when required basis. The chemistry of spent caustic solution, operating conditions, metallurgy and electrochemical behavior of line pipe in spent caustic was carefully reviewed. The design flow was also examined and certain flaws in design were identified. It was concluded that by modifying the diameter of 4 in. diameter existing line pipe in the design, the problem was solved. The original suggestions have been validated after more than 3 years of satisfactory service of said line pipe.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.