Abstract

The above article [1] contained some errors and needs to include the following errata list:

Highlights

  • Within the second paragraph, the following text: ‘‘the processing capacity deployed at i, calculated by subtracting the maximum allowable processing capacity (Cci) and the capacity required to satisfy the processing demands of the TGs served by the EN at i’’

  • Should be replaced with: ‘‘the processing capacity deployed at i, calculated considering the capacity required to satisfy the processing demands of the TGs served by the EN at i and the demand routed through this EN.’’ 2) Page 56023:

  • Pseudo-code Algorithm 4, line 46, should be replaced with: return bse

Read more

Summary

Introduction

Within the second paragraph, the following text: ‘‘the processing capacity deployed at i, calculated by subtracting the maximum allowable processing capacity (Cci) and the capacity required to satisfy the processing demands of the TGs served by the EN at i’’.

Results
Conclusion
Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.