Abstract

AbstractCoping with system verification in complex systems is a challenging task. This paper reports on how the high complexity of closely integrated systems and long timelines in development affects the verification process in an engineering company in Norway. The literature on verification in development and a survey within the industry‐as‐laboratory method were used to research the practice of verification in the case company to identify where the company's practice deviates from the recommended practice according to the literature. The research found that the company is taking shortcuts in its documented processes resulting in integration testing late in the development. The authors propose the use of metrics to monitor the progress of the system of interest and the project. In conclusion, continuously tracking and improving the work process is recommended to cope with the complexity of developing the company products.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.