Abstract

Metro is a common kind of rail transit system. Metro transfer station is an important node of rail transit network. In China, metro transfer station is always a limited space with crowded passengers. Currently, Intelligent Transport System and Advanced Public Transportation System have been applied to metro operation and management, but conflicts of passengers remain a problem and passenger waiting time is still very long. This paper deals with metro passenger transfer problem through coordination of different metro lines. Metro transfer optimization models are established including three scenarios: 1) single transfer station converged by two metro lines with the same scheduling plan; 2) single transfer station converged by two metro lines with different scheduling plans; 3) multiple transfer stations converged by two metro lines with different scheduling plans. All these scenarios suppose that transfer of passengers takes place in the same platform. Numerical examples are designed to validate the models. The results show that the models in this paper can provide coordination scheme of different metro lines to alleviate passenger conflicts and reduce passenger waiting time in transfer station.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call