Abstract

Concerning the rapid development and deployment of Renewable Energy Systems (RES) and Energy Storage System (ESS) including Power-to-Gas (PtG) technology can significantly improve the friendliness of the integration of renewable energy. The purpose of this paper is to develop a coordination strategy between a battery energy storage and a PtG system. A simulation case is created with an electrical and a natural gas grid as well as steady-state models of RES and PtG. Charging strategies are developed accordingly for the ESS as well as production strategies for the PtG system. The size of the ESS is then observed with regards to the RES and PtG systems. As a result, it is found that surplus energy from RES can be stored and then used to support the electrical grid and the natural gas grid. It is also concluded that the capacity of the ESS can be affected, given a proper charging and production strategy, which needs to be tailored to each system. As shown in the paper, due to an improper charging strategy in the first quarter of a month, the ESSPC size has increased from its optimal size of 314 MWh to roughly 576 MWh. It can also be seen that given a proper charging strategy, this capacity can be less than 200 MWh.

Highlights

  • In the past few decades, fossil-fuel energy meets most of the energy needs of the world [1]

  • This paper focuses on the 2035 milestone, and in that case, Renewable Energy Systems (RES) will need to cover more than one energy sector needing to increase its installed capacity

  • 5 Conclusions Coordination between Energy Storage System (ESS) and PtG systems will play a major role in the future power system

Read more

Summary

Introduction

In the past few decades, fossil-fuel energy meets most of the energy needs of the world [1]. With the high number of environmental problems and the depletion of fossil fuels, renewable energy will be a major electricity source for the power grid and the penetration of renewable energy such as wind and solar power will keep increasing. The turning point should occur around the year 2030 [2], and much work needs to be done to make different RES operate more efficiently. This can happen through new technologies, finding specific optimal geographical locations for placing RES or even creating new RES.

Objectives
Methods
Findings
Conclusion

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.