Abstract
:Coordination has been regarded as a critical factor of construction projects, but it is usually not well understood. It is common that time and money are spent on coordination, yet the performance is not as expected. This article studies the coordination needs and supply of construction projects. First, coordination needs were derived from work uncertainty and equivocality (U&E), and supply was offered by different methods engineers use to coordinate. Then ten subway construction projects were investigated. A questionnaire was modified to quantify the project U&E, and a time sheet designed to collect contractor engineers' work time allocated in nine coordination methods. Finally, how actual coordination time distribution met the needs and their relationships with performance were analyzed. The results indicate that the project performance is not related to the level of U&E. In the nine coordination methods of the studied projects, site visit took up the most time (23%), followed by correspondence (20.5%) and meetings (13%). Projects with good performance applied adequate oral or written coordination mainly based on work equivocality.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.