Abstract

This paper presents a coordinated voltage control scheme for improving the network voltage profile and for minimizing the steady-state loading of the STATCOM to effectively support the system during contingencies. The paper addresses implementation issues associated with primary voltage control and optimal tracking secondary voltage control for wind parks based on self-excited induction generators which comprise STATCOM and under-load tap changer (ULTC) substation transformers. The voltage controllers for the STATCOM and ULTC transformer are coordinated and ensure the voltage support. In steady-state operation, the voltage is controlled by only stepping the tap changer when the voltage is outside the deadband region of the ULTC to minimize the number of taps changes. Thus, the STATCOM will be unloaded and ready to react with higher reactive power margin during contingencies. In the paper, the effects of the short circuit ratio of the interconnection and the inherent communication delay between the wind park and the remote bus on the performance of the controllers and the maximum critical clearing time of fault are considered. Simulation results are presented to demonstrate the performance of the controllers in steady-state and in response to system contingency situations.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.