Abstract

The interdependence between natural gas and electric power systems is becoming increasingly tight, as the share of natural gas-fired units increases. Within this context, this paper addresses the coordinated expansion planning of natural gas and power systems. We analyze the tradeoff of building natural gas-related facilities (e.g., natural gas pipelines and natural gas-fired generation units) versus electric-power-related facilities (e.g., transmission lines and other generation units). We use a two-stage stochastic optimization model that provides an appropriate balance between accuracy and computational tractability and represents uncertainty pertaining to electricity and natural gas demands. We show the importance of representing uncertainty by computing the value of stochastic solution, which is significant. We analyze the functioning of the model through a small example and a case study based on the IEEE 118-bus system. Computational results confirm the need for detailed representation of both the natural gas and power systems to achieve investment decisions that are well coordinated and optimal.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.