Abstract

Energy storage systems (ESS) when integrated with large-scale photovoltaic (PV) plants, constituting a so-called Intelligent PV (IPV) power plant, are able to contribute to improve the economic viability of these power plants and to help them participate in the electricity markets as other traditional generators. In this paper, the sizing and control strategy co-optimization for an existing IPV power plant is proposed and implemented. A global linear programming (LP) optimization algorithm is developed, where the optimal components sizing is computed directly in the same optimization as the operating management of the storage system. In the IPV power plant design stage, the LP optimization is applied to obtain the optimal energy storage sizing parameters (capacity and power rate). In the operation stage, the same LP algorithm optimizes the control strategy to participate to electricity markets. This participation is based on the online model predictive control (MPC) to counteract PV forecast errors by participating in intraday markets. The proposed approach (optimal ESS sizing and online MPC) increases the daily economic benefits around 20%.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.