Abstract

Cutting parameters, process routes, and scheduling significantly affect carbon emissions and makespan of workshops. However, most current researches carried out cutting parameters, process routes, and scheduling decision independently and ignored their comprehensive effects on carbon emissions. To bridge the gap, this paper is aimed at solving cooperative optimization problem of cutting parameters, process routes, and scheduling (CCPJS) employing analytical target cascading (ATC). Firstly, a CCPJS-ATC model is presented and elements of the model are formulated, where carbon emissions and makespan are as optimization objectives. Secondly, a novel-augmented Lagrangian relaxation method is designed to solve the CCPJS-ATC model in a distributed manner. Finally, a case study is employed to verify the feasibility and effectiveness of the proposed method. It shows that the proposed method could achieve more carbon emissions and solving time savings compared with the traditional all-in-one approaches.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.