Abstract

Two-phase closed thermosyphon (TPCT) is a popular way to prevent permafrost layers from degrading, and consequently ensure the stabilities of engineering constructions in permafrost regions. Although TPCTs have been numerically and experimentally investigated for many years, long-term field monitored data concerning the cooling performance of TPCTs are limited. This paper presents the ground temperatures, embankment deformations and some related meteorological factors for a road section of the Qinghai–Tibet Highway before and after installing the TPCTs in permafrost regions. Based on the monitored data, three main aspects are analyzed: 1) cooling scope and period of the TPCTs; 2) cooling effects for the soil layers, especially for the permafrost layers; and 3) remedying effects with respect to embankment deformation and crack formation. Some corresponding suggestions are proposed for a better design of TPCTs in the construction of roadways in permafrost regions.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.