Abstract

Ways of conserving energy in the Moscow metro using capacitor reserves are considered. The scheme of a converting unit for the capacitor reserve is described. The results of simulating the operation of the converter in different variants are presented. Test measurements of the work of electrorolling stock in a recuperation mode and the simulation of the operation of a converter prove the reliability of the new techniques from the point of view of the functioning of safety system of train movement of automatic speed control and signaling, centralization, and blocking.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.