Abstract

A data driven exergy analysis has been conducted for the first known grid connected Underwater Compressed Air Energy Storage facility, located in Toronto, Canada. Further to examining the plant through conventional exergy analysis, results were enhanced by splitting exergy destruction rates into avoidable and unavoidable, as well as endogenous and exogenous parts via advanced exergy analysis. The conventional exergy analysis showed that under real operational conditions, the exergy destruction ratio was 47.1%, while under the theoretical unavoidable operational conditions it could be reduced to 15.9%. The overall outcome of the conventional exergy analysis was confirmed by the advanced exergy analysis, the details, however, were quite different. The results of advanced exergy analysis assigned the improvement priority to heat exchanger 4, followed by the turbine and the stage 3 compressor. Conversely, the conventional exergy analysis indicated that the total exergy destruction of the turbine was higher than that for heat exchanger 3. The advanced exergy analysis also revealed that 76.4% of the exergy destruction was avoidable, highlighting the significant potential of the system for performance improvement.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.