Abstract

The construction and demolition waste (CDW), which is produced by the construction process, presents 33% of the total waste stream in European Union in year 2010 (Eurostat 2010). A construction and demolition waste is generated during whole life cycle of construction design phase, realization phase, occupation phase and demolition phase. On the other hand, the sustainable design of construction in the design phase presents possibility for the significantly reduce a volume of generated construction waste. In this phase, we are able to identify and quantify the volume and sort of construction waste. Based on this information, it is possible to determine the possibilities of construction waste disposal and the costs for its treatment.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.