Abstract
Key TakeawaysWith elevated disinfection byproduct (DBP) levels in its distribution system, a water treatment plant in Maine worked with an engineering consultant to develop solutions and avoid possible regulatory violations.Four mitigation options were determined—two of them immediate and two long‐term, with the chosen strategy being premembrane coagulation.Recommendations from the success of the DBP mitigation project include being proactive, collaborating with team members and outside experts, and planning for resilience.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.