Abstract

Key TakeawaysWith elevated disinfection byproduct (DBP) levels in its distribution system, a water treatment plant in Maine worked with an engineering consultant to develop solutions and avoid possible regulatory violations.Four mitigation options were determined—two of them immediate and two long‐term, with the chosen strategy being premembrane coagulation.Recommendations from the success of the DBP mitigation project include being proactive, collaborating with team members and outside experts, and planning for resilience.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call