Abstract
The efficiency of the process of thiosulfate leaching of intermediate industrial products depends on the composition of the incoming raw materials, the operational control of which is impossible. In this paper, we propose upgrading of the process control system which allows reducing the downtime of the process equipment.
Highlights
In the case of using multi-component raw materials [2] in non-ferrous metallurgy, as a rule, several alternative technologies are developed [3]
The efficiency of the process of thiosulfate leaching of intermediate industrial products depends on the composition of the incoming raw materials, the operational control of which is impossible
We propose upgrading of the process control system which allows reducing the downtime of the process equipment
Summary
Series: Materials Science and Engineering 537 (2019) 032055 doi:10.1088/1757-899X/537/3/032055. Control system for thiosulfate leaching of intermediate industrial products in metallurgy. L A Kazakovtsev, P A Kustashev A S Polyakova, A M Popov and I A Panfilov
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have