Abstract
This paper takes a 1.5 MW wind turbine wind farm in Jilin province as an example. It analyzes the improvement of blade lengthening in wind turbine power generation by optimizing control strategy and adopting intelligent control technology. And it compares the economic benefits of replacing 82 blades and 89 blades and provides a theoretical and practical basis for blade lengthening transformation of other wind farms.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.