Abstract

Under normal operating conditions, a microgrid (MG) is interconnected with the medium voltage (MV) network. However, planned or unplanned events like maintenance or faults in the MV network, respectively, may lead to MG islanding. In order to deal with islanded operation and even black start following a general blackout, an emergency operation mode must be envisaged. Two possible control strategies were investigated and are described in this paper in order to operate a MG under emergency mode. A sequence of actions for a well succeeded black start procedure, involving microgeneration units, has also been identified contributing for an increase in distribution network reliability

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.