Abstract

The general problem is stated and typical solutions indicated. Characteristics of governors and of frequency- and load-control devices are briefly explained, and effects on generator and tie-line loads are summarized. Illustrating the principles enunciated, interconnected systems in southern Ontario and adjacent portions of Quebec totaling 1,650,000-kw generating capacity are described, also operating experience with automatic frequency control, and automatic load control of two ties, one of which is a 45,000-kw frequency-changer set inter-connecting systems of relatively large capacity.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.