Abstract

This paper deals with the control systems modeled by timed event graphs and max-pus algebra, which are tools used in the modeling of systems subject to phenomena of synchronization and delay. It is used a method for the computation of the parameters of a controller that controls the stream of material in the production process in multiple-input and multiple-output systems. The method ensures that the controller operates in accordance with the strategy Just-in-Time in production planning, for given production rate, in order to obtain the best possible control, which is obtained by delaying to the maximum the inputs of raw materials in the manufacturing process.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.