Abstract

Taking the demolition blasting of complex structure of continuous multi-span aqueduct as the research object and combining with the importance analysis of safety factors in safety evaluation, the blasting scheme, reliability of electric blasting network, pretreatment quality, protection of buildings around the blasting area and safety protection are emphatically studied. The numerical model of aqueduct is established by LS-DYNA. Through the simulation analysis of the whole process of aqueduct blasting demolition and collapse, the blasting breakpoint and the design of pretreatment notch are reasonably determined. Carry out the equivalent electric blasting network test and field blasting test to check the reliability of the blasting network and determine the single hole charge. By the analysis and verification of safety parameters such as blasting shock wave, collapse vibration and safety distance, the active protective measures are taken to protect the important structures and public facilities within the blasting area. The blasting effect and monitoring data show that the safety technical measures can effectively control the safety risk of aqueduct blasting demolition.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call