Abstract

Intelligent real-time control of a flexible manufacturing system (FMS) is a complicated task. The scheduling of machines and routing of jobs are nonpolynomial problems that have to be solved fast and accurately to obtain the advantages of an FMS. Such control is done hierarchically: part routing is considered in the cell level and the equipment control strategy is reviewed in the workstation level. Two methods of controlling an FMS are described, one for each level. The one that controls the workstation equipment utilizes a decision tables in which the system states are correlated to the decision variables. The method that routes parts between the machines in the cell uses a knowledge base that stores facts about the facility and recognizes evidence to generate a decision. Both methods are presented, along with results from simulation experiments.< <ETX xmlns:mml="http://www.w3.org/1998/Math/MathML" xmlns:xlink="http://www.w3.org/1999/xlink">&gt;</ETX>

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.