Abstract

Based on the object of self-anchored suspension bridge constructed with long segment hoist method, the load-carrying characteristics and construction technique which is different from other self-anchored suspension bridge is analyzed, and the method of calculation and control on steel box girder configuration during the construction course of long segment hoisted are proposed. For different calculation methods of girder configuration lifting, the influences of the three manners of pre-cambering for steel girders on the configuration and internal force of finished bridge are analyzed. The results show that inverse erection— forward erection—unstressed state synthetic method can guarantee the minimum deviation of steel girder configuration of finished bridge with the design, and it is not necessary to adjust the suspension cable force, and there is no change in main cable configuration and internal force.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.