Abstract

Abstract Variations in manufacturing lead times are a significant problem in industry today. Previous studies using serial lines have concentrated on deriving average lead times and maximizing throughput in particular situations. This paper tackles the issue of consistency of lead times, via the use of a simulation model. Three different types of control mechanism are tested; the use of slack time, reactive controls and predictive controls. Results from these models are provided. The conclusion to be drawn from this research is that predictive control mechanisms are the most likely to be generally applicable.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.