Abstract
The neutral beam test facility, which is under construction in Padova, Italy, is developing the ITER full-scale ion source for the ITER heating neutral beam injectors, referred to as the SPIDER experiment, and the full-size prototype injector, referred to as MITICA. The SPIDER control and data acquisition system (CODAS) has been developed and its construction will start in 2014.Slow control and data acquisition will be based on the ITER CODAC core system software suite that has been designed to facilitate the integration of ITER plant systems with CODAC. Fast control and data acquisition will use solutions specific to the test facility, as the corresponding concepts are not ready-to-use in the ITER design.The ITER hardware catalog for fast control has been taken into consideration. The software development will be based on the integration of MDSplus and MARTe, two framework software packages that are well known in the fusion community, targeting data organization and fast real-time control, respectively.The paper revises the system requirements and the system design and shows the results already achieved in terms of system integration. In addition, the paper will report the experience in the usage of different cooperating software frameworks and in the integration of industrial procured plant systems.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.