Abstract

Rwanda Government, via its Ministry of Infrastructure (MININFRA) and authority in charge of Water and Sanitation Corporation (WASAC) has instigated copious initiatives aimed at finding durable ensues to water scantiness in some country districts especially in Bugesera District. To date it lived by 453451 peoples with only 3600 m3/d available from Ngenda Water Treatment Plant (WTP) intents to treat cyohoha Lake. This research is conducted to handle water scantiness issues in Bugesera District with the aid of Gaharwa Lake. For attaining research directs, forms and onsite interrogates have been conducted, and Hazen–Williams equation has been used in designing processes. Therefore, the water treatment plant was designed with an awareness of water quality and quantity, population growth rate. Findings indicated that analyzed water quality parameters were bottled up by low turbidity: 4.2 NTU, Zn: 0.12 mg/L, NO3: 0.4 mg/L, Manganese: 0.047 mg/L, NH3-N: 0.04 mg/L, Fe2+: 0.61 mg/L, PH: 6.6, Fluoride: 0.11 mg/L, Alkalinity: 2 and Total hardness of 2.6 and water quantity should be 40723.8 m3/d. Additionally, The entire amount necessitated for the proposed Gaharwa WTP is 632,950.1957 USD. Eventually, Gaharwa Lake can be utilized as ensues to water scantiness in the Bugesera district. This research will greatly contribute to the lives of Rwandan people as well as Country Vision.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.