Abstract
The paper aims at demonstrating that the consideration of constant start-up costs and ramps of the thermal generating units for assessing the contribution of pumped-hydro energy storage to reduce the scheduling costs of hydrothermal power systems with high wind penetration, may yield unrealistic results. For this purpose, an isolated power system is used as a case study. The contribution of a pumped-storage hydropower plant to reduce the system scheduling costs is assessed in the paper by using a hydrothermal weekly unit commitment model. The model considers different start-up costs and ramps of the thermal generating units as a function of the start-up type. The effects of including pumped hydro energy storage in the system on the integration of wind energy, and on the start-ups and capacity factors of the thermal generating units are also evaluated. The results of the paper demonstrate that the consideration of constant start-up costs and ramps of the thermal generating units yields unrealistic results, and that the pumped-storage hydropower plant may help reduce the system scheduling costs by 2.5–11% and integrate wind power and may allow dispensing with some inflexible thermal generating units.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.