Abstract

Building on the multifunctional perspective from current contract theory, we conceptualize contractual complexity as a three-dimensional construct to depict the explicitness and elaborateness of control, coordination, and adaptation provisions in a construction project contract. A 13-item scale with construction project features is developed for measuring the different aspects of contractual complexity following rigorous scale development procedures. Using the structural equation modeling technique, empirical testing results demonstrate that all of the three components contribute significantly to contractual complexity. Further analysis indicated that treating contractual complexity in the three-functional way outperforms the unidimensional one regarding power to explain satisfaction and strong-form opportunism.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.