Abstract

The Nigerian construction industry is beset with many problems, such as uncompleted projects and poor quality work. Also the level of productivity is low, especially in projects handled by indigenous contractors. Investigation into the causes has identified two sets of variables, termed structural and systemic, as being responsible. Structural variables which are inherently related to the conditions and practices within a given environment, were found to be controllable, if special provisions can be made within the conditions of contract. The paper therefore examines these structural variables and relates them to provisions in the conditions of contract which undermine the performance of local contractors. It also suggests ways of improving the provisions to make them more effective.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.