Abstract

We investigate a contract setting problem faced by a manufacturer who can procure major modules from an overseas supplier, as well as a local supplier. The overseas supplier is prime and offers quality products, whereas the local supplier is viewed only as a backup, and its products are inferior in quality. As the local supplier needs to put in additional effort to fulfill the urgent orders, it is difficult for the manufacturer to estimate this urgent supplier’s production cost. This asymmetric cost information becomes an obstacle for the manufacturer in managing the urgent supplier. In this paper, we study two types of contingent contracts. One is the common price-only contract, and the other is a contract menu consisting of a transfer payment and a lead time quotation. We construct a Stackelberg game model and evaluate how the involvement of an urgent supplier with private cost information affects performances of the prime supplier and the manufacturer in different scenarios (with or without the urgent supplier, under different contingent contracts). We also conduct numerical experiments to show how the parameters of the contracts affect profits of the manufacturer.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.