Abstract

This paper provides an approach to quality supply by a supplier and quality inspection by a producer, which explicitly recognizes the inherently opposing interests these two parties may have. The supplier and the producer are modeled as players in a nonzero sum game, where the supplier can control the effort invested in the delivery of quality and the producer may or may not inspect incoming materials. We study the effect of contract design (e.g. stipulation of penalties for defective units) on equilibrium behavior and identify conditions on the contract parameters which will result in the implementation of a cooperative solution.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.