Abstract
This paper studies the role of electricity demand response program (EDRP) in the co-operation of the electric power systems and the natural gas transmission system to facilitate integration of wind power generation. It is known that time-based uncertainty modeling has a critical role in co-operation of electricity and gas systems. Also, the major limitation of the hourly discrete time model (HDTM) is its inability to handle the fast sub-hourly variations of generation sources. Accordingly, in this paper, this limitation has been solved by the operation of both energy systems with a continuous time model (CTM). Also, a new fuzzy information gap decision theory (IGDT) approach has been proposed to model the uncertainties of the wind energy. Numerical results on the IEEE Reliability Test System (RTS) demonstrate the benefits of applying the continuous-time EDRP to improve the co-scheduling of both natural gas and electricity systems under wind power generation uncertainty.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.