Abstract

The Chinese Government recently mandated the installation of continuous emission monitoring systems (CEMS) at state-controlled key polluting facilities in order to provide direct, real-time, continuous measurements of sulfur dioxide (SO 2) emissions. By 2010, most coal-fired power plants in China have installed and are operating SO 2 CEMS. As China's Central Government strengthens the SO 2 control program and implements new nitrogen oxides (NO X ) and carbon dioxide (CO 2) control programs, the quality of and confidence in CEMS data will become more important. This study utilizes field surveys and existing literature on Chinese CEMS to analyze their operation and management. Our study found that the Chinese government has issued a set of regulations and technical guidance documents to standardize CEMS operation, management, and supervision, and to improve the quality of CEMS data. Many power plants have followed key parts of the national CEMS rules and guidance and are periodically inspected by local environmental authorities. This study suggests several options for addressing some of the gaps and problems with the CEMS operation and supervision and thus enhancing China's CEMS program.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call