Abstract

This article describes a construction activity execution space analysis approach and a decision sup- port tool for resolving execution space interference and conflict between work-face construction activities. Lack of execution pace planning interrupt and badly affect the progress of construction activities. Also, in real situations, spatial congestion can severely reduce the productivity of workers sharing the same workspace, and may cause health and safety hazard issues. The aim of this article is to present a critical space-time analysis (CSA) approach that was developed to model and quantify workspace conges- tion and was encapsulated in a computerized tool dubbed PECASO (patterns execution and critical analysis of site- space organization) that was developed to assist site man- agers in the assignment and identification of workspace conflicts. A new concept of visualizing workspace com- petition between the construction activities is presented based on a unique representation of the dynamic nature of activities within the execution workspace, in 3D space and time. PECASO embraces 4D visualization and highlights the critical space control aspect to formulate an innova- tive 4D space planning and visualization tool. The CSA methodology and PECASO were validated using a real case study and the article concludes that the PECASO system has the potential to reduce the number of compet- ing workspaces, as well as the conflicting volume/space between occupied workspaces. This in turn produces bet- ter assessment of the execution strategy for a given project schedule. Additionally, the PECASO system has intro- duced a new way of communicating the program of work in a high level of detail for space planning purposes. ∗ To whom correspondence should be addressed. E-mail: n.n.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call