Abstract

The paper focus on queue for elevators and delays in construction industry. The author of the research was working at the position of manual worker in a skyscraper under construction in Poland. He conducted his research with the method of cover participant observation. Theoretical background of the study was the game theory

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call