Abstract

The continuous increment of construction projects worldwide is raising the amount of construction waste (CW). A significant amount of CW in landfills can critically impact the economy and environment if not addressed properly. Construction waste recycling (CWR) is one solution for reducing CW in landfills. Organizations are implementing various strategies for enhancing CWR implementation in practice. However, small-medium enterprises (SMEs) and large enterprises (LEs) might face different challenges in implementing those strategies due to their different organizational characteristics. Therefore, this study compares the cost and easiness of implementing CWR enhancement strategies between SMEs and LEs. To achieve that objective, this study analyzes survey data from 108 construction industry practitioners using descriptive statistics, normalization, Kruskal-Wallis, and overlap analysis techniques. The major findings include ‘raise project team awareness on CWR’ and ‘organize temporary bins in each construction zone’ are simple and low-cost enhancement strategies for all organization sizes. Also, there are additional simple and low-cost strategies for LEs: ‘identify construction activities that produce recyclable materials,’ ‘use information technology to facilitate CWR processes,’ and ‘enhance company policies related to CWR.’ These findings contribute to a better knowledge of the optimal CWR enhancement strategies for different organization sizes.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.