Abstract

With the continued rapid economic development in recent years, Urumqi, vehicle scale continues to expand, prompting the city traffic was a rapid growth trend, Outer Ring Road as a fast loop only existing within the city limits, borne traffic has far exceeded the original design prediction traffic volume and the actual capacity, resulting in a number of sections, interchange nodes, often made of ramp entrances become congested road, the outer ring road to solve the congestion problem, and it needs to be rebuilt to meet the expansion needs of the new era. Urumqi City East Outer Ring Expressway road expansion reconstruction project, for example, to explore the elevated expansion of the project construction methods, summarize experience in construction, hoping to provide a reference for future similar projects.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.