Abstract

A full-size prototype of a Micromegas precision tracking chamber for the upgrade of the ATLAS detector at the LHC Collider has been built between October 2015 and April 2016. This paper describes in detail the procedures followed in the construction of the components of the chamber in various INFN laboratories and the final assembly in the Laboratori Nazionali di Frascati (LNF). In addition, the results of the chamber exposure to a particle beam at SPS/H8 at CERN in June 2016 are presented. The performances obtained in the construction and the results of the test beam are compared with the requirements set in order to sustain the high radiation levels expected during the data-taking of the LHC in the next years.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.